Недавно искали: architect; log; goto; encode; advanced search; namespace;
Show in:
National language
National language
Transliteration lat.
Транслитерация RAK
Transliteration LoC
Books
Show in:
National language
National language
Transliteration lat.
Транслитерация RAK
Transliteration LoC
Show in:
National language
National language
Transliteration lat.
Транслитерация RAK
Transliteration LoC
Недавно искали: architect; log; goto; encode; advanced search; namespace;
Publication type
Region
скрыть невыбранное
показать все »
Published
reset filters
0
Publication type
Region
скрыть невыбранное
показать все »
Published
reset filters

Publications by Korobet︠s︡ P.:
Sort by:
Name
Date
Year
Author

Reconstruction of Grodno CHP plant – 2 with installed gas turbine PG 9171E capacity of 121.7 MW. The Republic of Belarus
Reconstruction of Grodno CHP plant – 2 with installed gas turbine PG 9171E capacity of 121.7 MW. The Republic of Belarus
Korobets P.
LAP LAMBERT Academic Publishing
Bo-Bassen: Riga, 2017,
Paperback, 108 p, (In Russian)
ISBN 978-3-330-34768-7
60 USD
Add to
Add to
LAP LAMBERT Academic Publishing
Bo-Bassen: Riga, 2017,
Paperback, 108 p, (In Russian)
ISBN 978-3-330-34768-7
1
0
Favorites
Delete all