Недавно искали: Logs; customize; decrypt; namespace; Sources; compressed;
Zeigen auf:
Transliteration RAK
Nationalsprache
Transliteration lat.
Transliteration RAK
Transliteration Loc
Bücher
Zeigen auf:
Transliteration RAK
Nationalsprache
Transliteration lat.
Transliteration RAK
Transliteration Loc
Zeigen auf:
Transliteration RAK
Nationalsprache
Transliteration lat.
Transliteration RAK
Transliteration Loc
Недавно искали: Logs; customize; decrypt; namespace; Sources; compressed;
Typ der Ausgabe
Region des Verlags
скрыть невыбранное
показать все »
Herausgegeben
Filtereinstellungen zurücksetzen
0
0
Warenkorb
0
Favoriten
alles löschen
Typ der Ausgabe
Region des Verlags
скрыть невыбранное
показать все »
Herausgegeben
Filtereinstellungen zurücksetzen

Nat︠s︡ionalʹnye i regionalʹnye faktory Strategii i Doroz︠h︡noĭ karty razvitii︠a︡ vozobnovli︠a︡emykh istochnikov energii oblasti/raĭona na primere Novogrudskogo raĭona Respubliki Belarusʹ

Verlag
Medisont
es ist herausgegeben in
Minsk
Erscheinungsjahr
2019
Seiten
132
Umschlag
Paperback
Stückzahl
200 Exemplare
Gewicht
0,342 kg
ISBN
978-985-7228-05-8
30 USD
Lieferkosten:
6 USD
hinzufügen in
hinzufügen in
Novogrudok became the second city in Belarus after Polotsk, which in 2012 joined the Covenant of Mayors, committing itself to reduce carbon dioxide emissions by 20 percent by 2020. The region has already implemented several energy-efficient programs and projects for the introduction of renewable energy sources. Purpose: To help the district executive authority and the local community to develop the accumulated experience in introducing renewable energy sources, which will help reduce the burden on the ecology of the region. Intermediate results: The project provides for the preparation of six feasibility studies (TEO), which will be used as proposals for potential investors. A feasibility study has been developed for the reconstruction of the boiler house in Novogrudok - it is planned to install equipment using local fuels there. An example of the spread of green technology in the region will be a pilot project for the reconstruction of the hot water supply system in the Novogrudok District Hospital. Heat pumps, solar thermal and photovoltaic panels will be installed here.
0
Warenkorb
0
Favoriten
alles löschen